Post spacingFence heightLength: 100 ft

A fence is one of those jobs that looks simple until you are standing in the store trying to work out how many fence posts do I need, how many pickets will cover the run, and how much concrete will hold it all up. This page does that maths for you in imperial or metric units, shows every formula it uses, and helps you price the materials before you buy anything.

Quick answer

For a 6 ft privacy fence with posts every 8 ft, pickets 5.5 in wide and no gap between them, the materials for the most common fence lengths are below. These figures are before any waste allowance, and rails are counted at three per section because the fence is 6 ft tall.

Fence lengthPostsRailsPickets
50 ft821110
100 ft1439219
150 ft2057328
200 ft2675437

A short regional note: in the UK, fence panels are a standard 6 ft (1.83 m) wide and are normally fitted between 75 mm or 100 mm posts, often with a gravel board along the bottom, and height limits apply, generally 2 m, or 1 m next to a highway in England, so always check before you build. In Australia, paling fences are commonly 1.8 m high and Colorbond panels are about 2.36 m wide, so panel counts there follow the panel width rather than a post spacing you choose.

The formulas

Every number above comes from four short formulas, and you can check any of them on paper in under a minute. Start by dividing the fence into sections, the bays between posts.

  • Sections = total length ÷ post spacing, rounded up. You cannot have part of a section, so 100 ft at 8 ft spacing is 12.5, which rounds up to 13 sections. The last section is a little shorter than the rest.
  • Posts = sections + 1, plus 1 extra post per gate. Add one more post for each gate opening.
  • Rails = sections × 2, or sections × 3. Fences under 6 ft get two horizontal rails per section; fences 6 ft or taller get three, because a taller fence catches more wind and flexes more.
  • Pickets = total length in inches ÷ (picket width + gap), rounded up. Then add your waste percentage and round up again, because you cannot buy part of a picket.
  • Concrete = posts × 2 bags. Panels, when you choose that style, are simpler still: one panel per section, so panels = sections.

People most often ask why posts are always one more than sections. Picture a short run of fence: it has a post at the start and a post at the end, with sections strung between them, like fence panels on a string. One section needs two posts, two sections share the middle post and need three, and so on. Every run of fence has a post at both ends, so the count is always sections plus one, forgetting that last post is the single most common ordering mistake.

Worked example

Take the 100 ft privacy fence from the quick answer table: 6 ft tall, posts every 8 ft, pickets 5.5 in wide with no gap, no gates, and no waste allowance, so you can follow the raw numbers.

  • Step 1, sections: 100 ft ÷ 8 ft = 12.5, rounded up to 13 sections.
  • Step 2, posts: 13 sections + 1 = 14 posts.
  • Step 3, rails: the fence is 6 ft tall, so 13 sections × 3 rails = 39 rails.
  • Step 4, pickets: 100 ft is 1,200 inches, and 1,200 ÷ 5.5 = 218.18, rounded up to 219 pickets.
  • Step 5, concrete and post length: 14 posts × 2 bags = 28 bags of concrete before waste, and each post needs to be 6 ft + 2 ft buried = 8 ft long.

Those are exactly the numbers the calculator gives for the same inputs, so you can trust it for your own length, and if you add the default 5% waste allowance, the picket count rises to 230, which covers cuts and the odd split board.

6 ft vs 8 ft post spacing

8 ft is the standard spacing, and it is cheaper. It uses fewer posts, fewer holes and less concrete, a 100 ft fence needs 14 posts at 8 ft spacing against 18 at 6 ft, and standard rails and pre-made panels are made to span it. For most garden fences in ordinary conditions, 8 ft is the sensible default.

6 ft spacing is stronger. Choose it in high-wind areas where a fence takes a real battering, for heavy panels that would flex or bow on a longer span, or for tall fences, which act like sails. The extra posts also help on exposed corners and on ground that slopes, where shorter sections are easier to keep level. You pay for the extra posts and concrete, but you get a fence that stays straight.

Pickets vs pre-made panels

Pre-made panels are faster. A panel fills a whole section in one lift, so a straight, level fence goes up quickly with fewer pieces to handle, and the cost per section is easy to price. The trade-off is flexibility: a rigid panel cannot follow sloping ground without being stepped, leaving triangular gaps underneath, and a damaged panel usually means replacing the whole panel.

Individual pickets are slower to fit, one board at a time, but they follow the ground as it rises and falls, so the top and bottom of the fence can track a slope smoothly. They are also easier to repair, one broken picket is a five-minute swap, and you can set the gap yourself, from tight privacy boards to an open picket look, using the same posts and rails.

Counting pre-made panels

The formulas above count panels as one per section, which is exact for a single straight run. For a fence with corners, count each straight run separately: panels per run = run length ÷ panel width, rounded up. A 6 ft panel is the standard width in the US, and the UK featheredge equivalent is 1.83 m; some vinyl panels are 8 ft wide.

Take a straight 60 ft run at 6 ft panels: 60 ÷ 6 = 10 panels, with 11 posts, one per panel plus one at the far end. Order one spare panel for the board that arrives damaged or gets cut wrong. If a run ends at a wall, you need no post at that end, so subtract one post. And a corner post is shared by two runs: when you add up the posts, count each corner once, not twice.

Gates, corners and concrete

A gate hangs from a post and latches to another, so each gate opening needs its own support. That is why the calculator adds one extra post per gate on top of the normal count: the run is broken at the gate, and a new end post appears. Corners work the same way in practice, a corner post carries fences running in two directions and takes more strain, so many builders use a larger post there. Count your total length along all sides, then add gate posts for each opening.

Gate hardware is not counted in these results. Hinges, a latch, and often a diagonal brace or an anti-sag kit are bought separately, and a wide gate may need a wheel or a double-leaf design. Budget for those on top of the timber and concrete. Wide gates also deserve diagonal bracing from the gate post back into the fence line, so years of swinging cannot slowly lever the post out of plumb.

The concrete figure is an estimate of 2 × 50 lb bags per post, based on a 4×4 post in a hole about 24 in deep. A wider or deeper hole, a 6×6 post, or loose soil will use more; a narrow hole in firm ground may use less. As a rule for depth, bury at least one-third of the above-ground height, with a 24 in minimum, and go below the frost line where that applies in your area, so frost cannot heave the post out of line.

Dig each hole about three times as wide as the post, roughly 12 in across for a 4×4, and tip 4 to 6 in of gravel into the bottom before the post goes in, so water drains away from the end grain instead of pooling against it. Frost depth itself ranges from a few inches in the mildest southern states to 3 to 4 ft in the coldest northern regions, so check your local code or a frost-depth map before you dig.

For the common hole sizes, the concrete works out as follows, using 0.60 cu ft per 80 lb bag and 0.45 cu ft per 60 lb bag: a 10 in × 30 in hole needs about 1.2 cu ft. 2 bags of 80 lb or 3 bags of 60 lb; a 12 in × 36 in hole, the sort dug for a corner or gate post, needs about 2.1 cu ft. 4 bags of 80 lb or 5 bags of 60 lb.

Setting a post that stays straight

Dig the hole, add the gravel, then stand the post in and brace it plumb in both directions, with a level held on two adjacent faces and temporary battens screwed to stakes either side. Fill the concrete in stages rather than one pour, tamping each layer down with a spare length of wood to chase out the air pockets, and check for plumb again after every stage, because a post drifts as the weight goes in around it. Finish by sloping, crowning, the top of the concrete away from the post on all sides, so rainwater runs off instead of sitting against the wood at ground level, which is the exact spot where posts rot.

UK readers will usually meet a different product: fast-set postcrete, sold per post, typically one 20 kg bag per post according to the label, with the water added in the hole. For a single-post repair on a Saturday morning it is hard to beat. For a long new run, though, ordinary bulk concrete works out cheaper per post and gives you more working time before it goes off in the barrow.

Before you dig

In the US, call 811, or use your local service, to have underground utilities marked before digging any post hole. It is free, it usually takes a few days, and it is the step that stops you putting a post hole through a gas, electric, water or data line. Wherever you live, use the equivalent local service before you dig; lines are often much shallower than people expect.

Also check your property line before the first hole, so the fence goes on your land and not your neighbour’s, and check your local permit and HOA rules. Those rules vary by area, height limits, materials and permit requirements differ from place to place, so there is no single universal rule; a short check with your local authority now is far cheaper than moving a fence later. Measure with a tape or wheel, not by pacing: a 33 in ‘yard’ pace under-measures 60 ft by several feet, enough to leave you one panel short.

Working out what the fence will cost, not just what it needs? Price the whole job, posts, rails, pickets, concrete and labour, with the Fence Cost Calculator.

Frequently asked questions

How many posts do I need for a 100 ft fence?

At 8 ft spacing, a 100 ft fence has 13 sections, so it needs 14 posts, one per section plus one extra at the far end. At 6 ft spacing it would need 18 posts. Add one extra post for each gate.

How far apart should fence posts be?

8 ft is the standard spacing for most wood fences and uses fewer posts. Use 6 ft in high-wind areas, for heavy panels, or for tall fences that need extra strength, and do not space posts further apart than your rails or panels can span without sagging.

How many pickets do I need?

Divide the fence length in inches by the picket width plus the gap, then round up. A 100 ft privacy fence with 5.5 in pickets and no gap needs 219 pickets before waste; add about 5% for cuts and damaged boards.

How much concrete per fence post?

About 2 x 50 lb bags for a 4×4 post in a 24 in deep hole. The amount varies with hole diameter and depth, soil and bag size, so treat it as an estimate and check the coverage printed on the bag for your hole.

How deep should fence posts be?

Bury at least one-third of the above-ground height, with a minimum hole depth of 24 in (about 61 cm). A 6 ft fence therefore needs an 8 ft post. Go below the local frost line where that applies.

Do I need a permit to build a fence?

It varies by jurisdiction. Some places require a permit or limit fence height, and HOA rules may add conditions, so check with your local authority and any HOA before you build. Do not assume the rules from another area apply to you.

Can I set fence posts in gravel instead of concrete?

It is possible for some fences, and gravel does drain well, but posts set in gravel can work loose over time and are harder to set dead plumb. For panel fences, and anything carrying a gate, concrete is the durable standard and the one worth paying for.

How many fence panels do I need for a 100 ft fence?

At the standard 6 ft panel width, 100 ft ÷ 6 ft = 16.67, rounded up to 17 panels, with 18 posts, one per panel plus one at the far end. Count each straight run separately, and count each corner post once, not twice.

Related calculators

Sources

Post spacings, picket widths and concrete quantities follow standard lumber-yard practice: posts every 6 or 8 ft, pickets at their actual width rather than the nominal size, and two 50 lb bags of concrete per post as an estimate. Check your supplier’s actual picket width and bag weight before ordering, since both vary by brand and region.

Changelog

  • 28 October 2026: the fence-post and fence-panels guides merged into this page; both now redirect here
  • 28 October 2026: structured data updated. WebApplication and FAQPage schema added.
  • 27 October 2026: page rebuilt on the shared calculator template; maths unchanged.

Cite this page

APA: Wolveyes. (2026, October 27). Fence Calculator. Wolveyes. https://wolveyes.pk/calculators/fence-calculator/

MLA: “Fence Calculator.” Wolveyes, 27 Oct. 2026, https://wolveyes.pk/calculators/fence-calculator/

<iframe src="https://wolveyes.pk/calculators/fence-calculator/" width="100%" height="600" style="border:1px solid #E5E0D5;border-radius:8px;" title="Fence Calculator by Wolveyes"></iframe>
<p><a href="https://wolveyes.pk/calculators/fence-calculator/">Fence Calculator by Wolveyes</a></p>