Concrete Calculator

Home › Calculators › Concrete Calculator

Slabs, circles and post holes: cubic yards, bag counts and truckloads.

Length: 10 ft Width: 10 ft Thickness: 4 in

If you are pouring a patio slab, setting fence posts or pricing a driveway, the first question is always the same: how much concrete do I need, and how many bags of concrete do I need if I mix it myself? This calculator answers both. Enter your dimensions once and it works out the volume in cubic yards, cubic feet and cubic metres, the number of bags at the size you choose, an estimate of the weight, and what the same job would cost as ready-mix, using prices you enter yourself.

How much concrete do I need? Quick table for common slabs

These are the slabs people ask about most. Every figure below is for a slab 4 in thick, includes 10% waste, and counts bags at the 80 lb size:

Slab size (4 in thick)Cubic yards (with 10% waste)80 lb bags
8 × 8 ft0.87 yd³40
10 × 10 ft1.36 yd³62
12 × 12 ft1.96 yd³88
10 × 20 ft2.72 yd³123
24 × 24 ft7.82 yd³352

Bags per cubic yard of concrete: 45 bags of 80 lb, 60 of 60 lb, 90 of 40 lb.

Footings and post holes use the same maths. A strip footing trench 30 ft long, 1.5 ft wide and 1 ft deep holds 45 cu ft, about 1.67 yd³ before waste (1.83 yd³ with 10%). A fence post hole 12 in across and 36 in deep holds about 2.4 cu ft before the post goes in, roughly 4 × 80 lb bags once the post displaces its share, as worked through below.

A note on the biggest row: at 24 × 24 ft you are looking at 352 bags. Mixing 352 bags is a full day of mixer loads, lifting, mixing and placing several tons of concrete bag by bag, and at that size ready-mix delivered by truck is the sensible choice.

The formula, step by step

Concrete is sold by volume, so every calculation on this page is really one idea: work out the volume of the slab or hole, then convert it into the units you order in. Nothing here needs more than a tape measure and a few divisions.

  • Rectangular slab: volume = length × width × thickness, with everything in feet. Thickness is usually measured in inches, so divide it by 12 first. 4 in is 0.333 ft.
  • Circular slab: volume = π × radius² × thickness. The radius is half the diameter, and π is about 3.1416.
  • Post holes: volume = π × radius² × depth for one hole, then multiply by the number of holes.
  • Strip footing: volume = length × width × depth of the trench, exactly like a slab. A trench 20 ft long, 1 ft wide and 1 ft deep holds 20 cu ft, which is 0.74 yd³. Because a trench is long, small errors in width or depth repeat along the whole run, so measure the dug trench in a few places and use the averages.
  • Stairs: treat each step as a rectangular box, work out its volume with the slab formula, and add the boxes together. A flight is really a stack of slabs of increasing length.
  • L-shaped slabs: break the slab into rectangles, work out each one separately, and add the volumes together. Odd corners and cut-outs rarely change the total much, but a missing rectangle does.
  • Convert: cubic yards = cubic feet ÷ 27, exact, because a cubic yard is a cube 3 ft × 3 ft × 3 ft. Cubic metres = cubic feet ÷ 35.31.
  • Add waste: multiply by 1.10 for a 10% allowance, so you order a little more than the neat geometry says.
  • Bags: divide the volume with waste by the yield of one bag. 0.60 cu ft for an 80 lb bag, and always round up, because you cannot buy part of a bag.

The calculator does exactly these steps, in exactly this order, which is why the table above and the worked example below match its results. If your own hand calculation disagrees with a supplier’s quote, one of these steps, usually thickness or waste, is where the difference is hiding.

Figuring yards of concrete for a slab

Most people who go looking for a concrete yard calculator — or a calculator for concrete yards — are doing one job: figuring yards of concrete for a slab before they order. The steps are always the same, and they take less than a minute with a tape measure:

  • Measure the slab in feet. Length × width gives the area in square feet. A 10 × 10 ft slab is 100 sq ft.
  • Turn the thickness into feet. Inches ÷ 12. A 4 in slab is 0.333 ft thick.
  • Multiply area by thickness. That gives cubic feet: 100 × 0.333 = 33.3 cu ft.
  • Divide by 27. Cubic feet ÷ 27 = cubic yards: 33.3 ÷ 27 = 1.23 yd³ net.
  • Add 10% waste. 1.23 × 1.10 = 1.36 yd³ to order.

That five-step method is all any concrete calculator yards tool is doing, including the one at the top of this page. Once you have the yards, the Concrete Cost Calculator turns them into a price with your local rate per yard, a delivery fee and a bags comparison.

Worked example

Take the most common job on this page: a 10 × 10 ft slab, 4 in thick, for a shed base or patio.

  • Step 1, volume: 10 ft × 10 ft × (4 ÷ 12) ft = 33.3 cu ft.
  • Step 2, cubic yards: 33.3 ÷ 27 = 1.23 yd³ net.
  • Step 3, add waste: 1.23 × 1.10 = 1.36 yd³ with 10% waste.
  • Step 4, bags: the volume with waste is 36.7 cu ft, and 36.7 ÷ 0.60 = 61.1, rounded up to 62 × 80 lb bags.
  • Step 5, weight check: 33.3 cu ft × 150 lb per cu ft is about 5,000 lb of concrete, worth knowing before you plan to move it in a small trailer.

So the headline answer for that slab is 1.36 yd³ to order, or about 62 bags to buy. It also sits right on the bags-versus-truck borderline discussed next.

Fence posts work the same way, on a smaller scale. A standard hole 12 in across and 36 in deep holds π × 0.5² × 3 = about 2.36 cu ft. The post itself takes up room: a 4 × 4 post (a true 3.5 in square) displaces roughly 0.25 cu ft over its buried length, leaving about 2.1 cu ft of concrete to place. Divide by the 80 lb yield: 2.1 ÷ 0.60 = 3.5, rounded up to 4 × 80 lb bags per post. Shallower 30 in holes need nearer 2–3 bags. A ten-post run needs around 40 bags, a pallet, not a car boot, so plan delivery accordingly.

Bags vs ready-mix: which is cheaper and when

Bags suit small jobs. There is no delivery to book, no minimum order and no truck clock running: you mix only what you can place, when you are ready. For a few post holes, a small equipment pad or a repair, bags are usually the cheaper and simpler route overall, even though the concrete itself costs more per yard, because a ready-mix delivery brings fees of its own.

The crossover is roughly 1 yd³. Beyond that, ready-mix is usually cheaper per yard, faster and more consistent: the plant batches the whole pour to one recipe, and a truck places in minutes what would take hours of mixing bag by bag. Concrete that arrives in one pour also sets as one slab, rather than as a patchwork of mixer loads placed at different times.

One catch: under about 7 yd³ many suppliers add a short-load fee of roughly $50–200, because a part-full truck still costs them the same trip. That fee can wipe out the saving on a small load, so ask about it before ordering, and compare the delivered price, truck plus any fee, against the bag cost from the calculator, not the per-yard price alone.

Mixing bags without weakening the mix

Follow the water on the bag, roughly 3 quarts of water for an 80 lb bag. Too little and the mix will not consolidate; too much and it cures weaker and cracks more readily. Never add extra water for workability: if the mix feels stiff, mix it a little longer rather than reaching for the hose.

Mix one bag at a time in a wheelbarrow: add most of the water first, then the bag, and mix to an even consistency before placing. It keeps batches uniform from the first bag to the last. Beyond about 10 bags, rent a small electric mixer for the day, it turns an exhausting slog into steady work.

How thick should a slab be?

  • 4 in for patios, walkways and sheds. This is the standard for foot traffic and garden buildings on a prepared, level subgrade.
  • 5–6 in for driveways and garage floors. Vehicles, turning wheels and point loads from jacks and stands all ask more of a slab, and many builders add mesh or rebar at this thickness.
  • Footings and load-bearing work follow code. Their depth and width are set by your local building code and the ground underneath, not by a rule of thumb. They are commonly 12 inches deep or more, and width matters as much as depth because the footing spreads the load.

Whatever thickness you choose, measure the forms rather than trusting the plan. A slab dug to 5 in where 4 in was intended needs about 25% more concrete, which is another reason the waste allowance in the calculator matters, and why it should never be set to zero.

Common mistakes

  • Ordering with no waste allowance. Forms bow under wet concrete and the subgrade is never perfectly level, so the neat volume is always a little less than the real one. Running short mid-pour leaves a weak cold joint and an expensive second delivery.
  • Guessing thickness. A slab is rarely the same depth everywhere. Measure inside the forms at several points and use the average, not the shallowest reading.
  • Forgetting how much a small error matters. A half-inch of thickness error is about 11% of the volume of a 4 in slab. Small measuring slips become whole extra bags, or a shortfall, very quickly.
  • Ordering bags for a job that needed a truck. If the bag count runs into the hundreds, stop and price ready-mix. Hundreds of bags mean hours of lifting and mixing, and a pour that goes in slowly, in batches, instead of all at once.
  • Mixing inches and feet. Multiplying 10 × 10 × 4 without converting the 4 inches into feet gives an answer twelve times too big. Convert the depth first, every time: inches ÷ 12 = feet.
  • Using diameter where the formula wants radius. Circle formulas need the radius, half the diameter. Squaring the diameter instead multiplies the result by four.
  • Rounding down. Concrete is ordered and bagged in whole units. A result of 1.23 yards or 55.5 bags always rounds up, never down.

US, UK and Australia: yards, metres and bag sizes

The US orders ready-mix in cubic yards and buys bagged concrete in 40, 60 and 80 lb bags. The UK and Australia order ready-mix by the cubic metre (m³) and buy 20 or 25 kg bags. The Metric mode of the calculator covers both systems, the same formulas, with metric units and bag sizes. Prices vary too much by town and supplier for any calculator to hard-code them, so the price fields are yours to fill in: enter your own local prices and the comparison uses those, not a guess.

Disclaimer

This calculator works out volumes only, it is not a structural design. Slab thickness and reinforcement for load-bearing work, foundations, retaining walls over 4 ft and anything structural need an engineer and usually a permit under your local code.

Concrete guides

Prefer to work things out on paper first? These guides cover the materials around the pour, with worked examples.

Frequently asked questions

How many 80 lb bags of concrete make a cubic yard?

About 45. One cubic yard is 27 cu ft and an 80 lb bag yields about 0.60 cu ft, so 27 ÷ 0.60 = 45 bags, before any waste allowance.

How much concrete do I need for a 10×10 slab?

At 4 in thick, a 10×10 ft slab is 33.3 cu ft, which is 1.23 yd³ net. Add 10% waste and you need 1.36 yd³, which is about 62 × 80 lb bags.

Should I add extra for waste?

Yes, add 5–10%, with 10% a sensible default. Forms bow, the subgrade is never perfectly level, and some concrete stays in the barrow, on tools and in the mixer.

How much does a cubic yard of concrete weigh?

About 4,050 lb. At 150 lb per cu ft, 27 cu ft × 150 lb = 4,050 lb (roughly 1,840 kg). Density varies a little with the mix and aggregate, so treat it as an estimate.

When is ready-mix cheaper than bags?

Roughly beyond 1 yd³. Below that, bags are usually simpler and cheaper overall; above it, a truck is usually cheaper per yard, faster and more consistent, but watch for short-load fees on small loads.

What is a short-load fee?

It is a surcharge many ready-mix suppliers add when a load is well under a full truck, often on orders under about 7 yd³. It commonly runs to roughly $50–200, so ask about it before you order.

How much water does an 80 lb bag need?

About 3 quarts, but always follow the instructions printed on the bag, because blends vary slightly. Add most of the water to the wheelbarrow or mixer first, then the bag, and resist adding extra: too much water weakens the cured concrete.

Can I mix concrete bags in the hole for fence posts?

You can — dry-pour products and methods exist, where dry mix is tipped into the hole and water added on top. It is convenient for a single garden post, but pre-mixing in a wheelbarrow gives a stronger, more reliable set, because you control the water and know the mix is uniform all the way down.

How long do bags of concrete keep?

Several months if they are kept dry, off the ground and under cover. Bagged mix absorbs moisture from the air and from concrete floors, and slowly hardens in the bag. If a bag has gone lumpy or rock hard, it has taken on water and should not be used for anything structural.

Related calculators

Sources

Concrete is ordered by the cubic yard (Portland Cement Association, cement.org). Bag yields are manufacturer-stated and printed on the bag, for example, an 80 lb bag yields about 0.60 cu ft (Quikrete, quikrete.com). Bag yields vary by brand and mix, so check the bag you buy.

Changelog

  • 16 November 2026: added a step-by-step section on figuring yards of concrete for a slab, linked to the new Concrete Cost Calculator.
  • 28 October 2026: the concrete-formula, how-much-concrete and how-many-bags guides merged into this page; all three now redirect here
  • 28 October 2026: structured data updated. WebApplication and FAQPage schema added.
  • 27 October 2026: page rebuilt on the shared calculator template; maths unchanged.

Cite this page

APA: Wolveyes. (2026, October 27). Concrete Calculator. Wolveyes. https://wolveyes.pk/calculators/concrete-calculator/

MLA: “Concrete Calculator.” Wolveyes, 27 Oct. 2026, https://wolveyes.pk/calculators/concrete-calculator/

<iframe src="https://wolveyes.pk/calculators/concrete-calculator/" width="100%" height="600" style="border:1px solid #E5E0D5;border-radius:8px;" title="Concrete Calculator by Wolveyes"></iframe>
<p><a href="https://wolveyes.pk/calculators/concrete-calculator/">Concrete Calculator by Wolveyes</a></p>
PHP: 2026-11-16 17:15:53 [notice X 0][/home/wolveyes/htdocs/wolveyes.pk/wp-content/plugins/elementor-pro/modules/forms/submissions/actions/save-to-database.php::193] {closure:ElementorPro\Modules\Forms\Submissions\Actions\Save_To_Database::__construct():193}(): Implicitly marking parameter $exception as nullable is deprecated, the explicit nullable type must be used instead [array ( ‘trace’ => ‘ #0: Elementor\Core\Logger\Manager -> shutdown() ‘, )]