To winterize a pool, close it once the water stays below 65°F, balance the chemistry, shock the water, lower the water level, blow the plumbing lines dry, add pool antifreeze, drain the equipment and put the winter cover on. The water temperature is the trigger, not the calendar: algae growth slows below 65°F and stops below 40°F. Never drain the pool fully: an inground pool can lift out of the ground on groundwater pressure, and an above-ground liner shrinks and crinkles if the water drops too far. A DIY closing costs about $150 to $400, and most of the job is one afternoon of work.

When should you winterize a pool?

Close the pool once the water temperature stays below 65°F for several days, measured in the mid-afternoon, and before the first hard freeze. Closing earlier leaves warm water sitting under a cover, which is exactly the condition algae likes. The median first 32°F night falls on 9 October in Denver, 28 October in Chicago and 20 November in Atlanta, based on NOAA 1991 to 2020 climate normals, while Miami and Los Angeles have no freeze in most years. That spread is why the water temperature matters more than the date: a pool in Atlanta can stay open weeks after a pool in Denver is closed. If the water is still above 65°F, keep the pump running and wait. If a hard freeze is forecast before the water cools, close anyway and accept a greener spring opening over cracked pipes.

What chemicals do you need to close a pool?

Start with the water chemistry, and aim for the higher ends of the ranges so the chemicals last through the covered months. The winter targets are pH between 7.2 and 7.6, total alkalinity between 80 and 120 ppm, and calcium hardness between 175 and 275 ppm for an inground pool or 200 to 400 ppm for an above-ground pool. Pour in a scale and stain remover a night or two before you plan to cover the pool. Then shock the water to kill off bacteria and algae before closing, and keep the pump running for at least 12 hours after shocking before you cover the pool. Algaecide is optional but worth adding, and a winterizing pill or a winter chemical kit covers the same ground in one product. The chemistry step is the one that decides whether the pool opens clear or green in spring, so test with a kit rather than guessing from the look of the water.

How to winterize an inground pool

Work through these steps in order, and set aside most of a day: the shock needs 12 hours of pump time, and the blow-out is the step that must not be rushed.

  1. Clean the pool. Brush the walls and floor, vacuum the bottom, and empty the skimmer and pump baskets. Leaves and dirt left in the pool over winter stain the surface and feed algae.
  2. Balance the water. Test with a kit and bring pH to 7.2 to 7.6, alkalinity to 80 to 120 ppm and calcium hardness to 175 to 275 ppm.
  3. Shock and add winter chemicals. Shock the water, run the pump for at least 12 hours, then add algaecide or a winterizing pill.
  4. Backwash the filter. Backwash a sand filter until the sight glass runs clear, or clean a cartridge or DE filter, so dirty water does not sit in it all winter.
  5. Lower the water level. Drain to 4 to 6 inches below the skimmer mouth. Never drain the pool fully: groundwater pressure can lift an empty inground pool out of the ground or crack the shell.
  6. Blow out the lines. Use a high-volume, low-pressure air blower to push the water out of every plumbing line until only air comes through, then fit expansion plugs in every return and the main drain. Pentair warns that compressed air can make filter components explode and limits purging to a blower under 5 PSI, so never use a high-pressure compressor on pool lines.
  7. Add antifreeze. Pour about 1 gallon of pool antifreeze per 10 feet of piping into the lines. Use propylene glycol pool or RV antifreeze only: automotive antifreeze is ethylene glycol, which is toxic and must never go in a pool.
  8. Drain the equipment and cover. Drain the pump, filter, heater, chlorinator and any booster pumps, and open all drain plugs. Store the plugs in the pump basket so you can find them in spring. Fit a safety cover, mesh or solid, anchored to the deck, and add a leaf net on top if trees overhang the pool.

How to winterize an above-ground pool

The core steps are the same, but above-ground pools have simpler plumbing and their own rules. Clean the pool, balance the chemistry to pH 7.4 to 7.6 and calcium hardness 200 to 400 ppm, shock it and run the pump for 12 hours, then lower the water only slightly, to just below the return jet fitting. Above-ground pools rely on the water weight to support the walls, so never drain more than needed: the liner can shrink, crinkle or detach if the water level drops too far. Disconnect the hoses from the pump and filter, drain them fully and store them flat, not coiled, since a coil traps water. Plug the pool inlet and outlet openings with winter plugs, and move the pump, filter and heater indoors or into a dry garage. Float an air pillow in the centre of the pool before covering: it absorbs the pressure of expanding ice and keeps the cover from sinking under rain and snow. Fit the winter cover with the cable and winch system around the top rail, and store the drain plugs in the pump basket. Some owners take a soft-sided above-ground pool down for winter instead; if the maker allows it, clean and dry it fully before folding, since a damp liner grows mould in storage.

What happens if you skip winterizing?

Trapped water freezes, expands by about 9 percent, and cracks pipes, fittings and equipment from the inside. That is the single most important step in the whole job: clearing water from the plumbing lines. Skipping it can cost hundreds to thousands of dollars in pipe repairs, and a cracked skimmer or filter housing is a replacement, not a repair. The chemistry matters too: a pool closed dirty or unbalanced opens green in spring, and a green opening costs a full shock, days of filtering and often a partial drain. A cover left off lets leaves and rain in all winter, which stains the surface and adds hours of cleaning in spring. Winterizing is one afternoon against a spring of repairs and a summer of cloudy water.

Do you need to winterize a pool in a warm climate?

It depends on whether your water freezes. If temperatures never drop below freezing where you live, skip the blow-out and antifreeze steps, but still close the pool: clean it, balance the chemistry, shock it, clean the filter and put the cover on. The chemistry, shock, filter and cover steps apply regardless of climate. If you keep the pool open through a cold snap, run the pump in freezing weather to keep the water moving, since moving water does not freeze as readily and protects the pipes. If a freeze is forecast and the pool is open, that is the night to run the pump all night rather than on its normal timer.

For the running costs of the equipment you are putting away, see our pool pump cost calculator, and our pool volume calculator for the gallons in the pool before you dose the chemicals.

Frequently asked questions

When should I winterize my pool?

Close the pool once the water temperature stays below 65°F for several days, measured in the mid-afternoon, and before the first hard freeze. Algae growth slows below 65°F and stops below 40°F, so closing earlier leaves warm water under a cover.

How far do I drain my pool for winter?

Lower an inground pool to 4 to 6 inches below the skimmer mouth. Lower an above-ground pool only slightly, to just below the return jet fitting. Never drain a pool fully: groundwater can lift an inground pool, and an above-ground liner shrinks and crinkles.

Can I use car antifreeze in my pool lines?

No. Use propylene glycol pool or RV antifreeze only, about 1 gallon per 10 feet of piping. Automotive antifreeze is ethylene glycol, which is toxic and must never go in a pool.

Do I need an air pillow in an above-ground pool?

Yes. Float an air pillow in the centre of the pool before covering it. It absorbs the pressure of expanding ice and keeps the cover from sinking under rain and snow.

Sources

The DIY closing cost of $150 to $400, the 1 gallon of antifreeze per 10 feet of piping figure, and the 10-step closing sequence follow a pool closing checklist updated in May 2026. The 65°F closing rule, the 7-step winterization process, the pH range of 7.2 to 7.6, the 9 percent ice expansion figure, and the air pillow guidance follow a complete pool winterization guide updated in October 2026. The Pentair blower limit of under 5 PSI, the Loop-Loc winter water levels, the NOAA first-freeze dates of 9 October in Denver, 28 October in Chicago and 20 November in Atlanta, and the algae figures of growth slowing below 65°F and stopping below 40°F follow a November 2026 pool winterization guide compiled from manufacturer manuals and NOAA climate data. The pH range of 7.4 to 7.6 for above-ground pools, the alkalinity range of 80 to 120 ppm, the calcium hardness ranges of 175 to 275 ppm for inground pools and 200 to 400 ppm for above-ground pools, and the 4 inches below the skimmer figure follow a 10-step pool closing guide. The 12 hours of pump time after shocking, the propylene glycol only rule, and the repair cost of hundreds to thousands of dollars follow a 2026 pool closing and winterization guide.

Changelog

  • 18 November 2026: guide published.